Funding entity Iberdrola Ingeniería y Construcción
This project is aimed at determining the conditions for the islanded operation of the cogeneration plant of the BP Oil refinery in Castellon. We determine the conditions that require the islanded operation and the load to be shed so the plant is supplying the loads at stable frequency and voltage.
IberdrolaIngenieriaIslaBP